How does SAGD affect local water sources?

Emily Hope Howland
04/14/10 15:35:48
@emily-hope-howland
After reading through the entire EIA in search of the percentage of river flow used in SAGD and the water to oil ratio in SAGD, I did not find any specific numbers. These paragraphs from the EIA make up the core of the impact study on water:

4.10.3 Location and treatment of drilling water and production tests
All produced water, sewage water and drilling water will be segregated, stored in tanks or on site, treated, and disposed of at an official site. This will be regulated and monitored by the contractor and supervised by Environmental personnel.

4.11.3 Water Treatment
Water from the mud and floccule DEWATERING process, counterwell water, and water used to wash equipment are treated. The objective is to adjust the physio- chemical parameters such that discharges are in compliance with RAOHE environmental regulations.
The operative system consists of two vertical tanks equipped with an air hose for agitation. The treatment unit consists of a centrifuge pump and two tanks which mix the chemicals for the vertical tanks.

7.15.4.10 Management of formation waters
Formation waters must not be dumped into the environment without prior treatment, due to their high levels of salinity and the chemical residue they possess. If these enter a water body, it could cause damage to life forms in the ecosystem.
Crude produced shall be processed and, as a result, separated from formation gasses and waters. The formation water shall be passed through a water scrubber, where the remaining particles are removed from the crude and later stored in their respective tanks. Later, the formation water should be reinjected into a well designed specifically for this reason.

The EIA does not state the percentage of river flow that will be used, nor does it state the water to oil ratio in the SAGD process. In the article that states that 65% of Athabasca River drainage is from oil sands, the author also states that between 2 and 4 barrels of water are used for every barrel of oil recovered. Unfortunately I cannot find the exact ratio for the SAGD process in PungarayacuI find it surprising that the EIA doesnt have this information. Rather, the EIA states that, given the conditions that the identified activities are carried out under, the impacts on this factor are largely irrelevant. These conditions are:

-Inadequate disposal of solid wastes that are taken to bodies of water during the construction and operations phase.

-The presence of drilling mud, residual industrial water and residual domestic water can chemically contaminate bodies of water in the camps area of influence resulting from a lack of precautions in the management of liquid runoff during the drilling process. [Environmental Impact Assessment (EIA) and Environmental Management Plan (PMA) to do Appraisal Drilling and Production Tests in Block 20 for Wells IP-13, IP-15, IP-5A and IP-5B.]

To answer your question about how much oil is recoverable, according the contract, the first three-year phase is expected to produce 30,000 barrels of crude per day. The pilot phase, which is another three years, expects to extract 60,000 barrels a day and the extraction phase, 24 years with the possibility of extension, expects between 90,000 and 120,000 barrels of oil per day.

Ivanhoe also stated in a March 13th press release that, ENI, the Italian national oil company, is producing approximately 30,000 barrels of oil per day from the Hollin formation approximately 40 miles southeast of Block 20.

As for Treys comment:
Emily mentioned only three wells for the first three years but I believe the 23 well figure for the first phase might be more accurate. It would be hard to delineate the boundaries of the field with only three wells.

When I went to the Ministry of the Environment in Quito they knew nothing about the possibility of exploring more than four wells in the first phase. I asked them what Ivanhoe would need to do to legally construct more than the four wells accounted for in the EIA. The ministry said that Ivanhoe would need a new environmental license and an environmental impact study. Ivanhoe has told communities in Pano and Misahualli that they will begin seismic testing for wells that are not part of the EIA. Members of Pano communities are deeply concerned about Ivanhoes social and environmental impact. When Ivanhoe representatives visited the community in March they told the community that they did not have a choice as to whether they entered. Community leaders are waiting to see paperwork with Ivanhoes permission to enter.

Word on the street:
-The town of Napo held a strike against Ivanhoe last week the day the company was set to enter with machinery. Town and community members blocked the road to the community of Ceibo where the platform will be constructed. Ivanhoe never showed up with its machinery, probably after seeing the president of the Junta Parroquial of Napo go on television announcing the protest the night before.

-The SAGD or HTL process still has not occurred at the Nueva Esperanza well, putting the process behind schedule. According to locals, the company is waiting for funds to be able to continue with the process. Some have said that the oil there is too heavy and is, therefore, not commercially viable but results from the chemical testing of the crude samples from the site still have not returned.

-Ivanhoe has guaranteed 90% employment of natives in each well site. However, Ivanhoe contracted out to Ecuadorian companies for the construction, drilling and transportation at well sites. It is up to these companies to employ locals. In Nueava Esperanza the security guards at the well site were hired from Quito because the company said the Kichwa people of Cotundo/Nueva Esperanza lacked experience. In Napo, for example, the contracted company Comasey, which will employ workers for various activities, has allotted 34 jobs. But at least 25 of these jobs are for specialized engineers, who come from outside of the province.